Swarly Road Construction

Profiling

We offer professional profiling and cold milling services, delivering precise, efficient and safe removal of existing pavements.

Our team utilizes advanced machinery and industry-leading techniques to ensure high-quality results for both small-scale and large infrastructure projects.

Profiling Services

Swarly’s Asphalt profiling services consists of the following methods:
Road Resurfacing & Preparation

Efficient removal and preparation of old pavement for new surfacing, ensuring a smooth and even base.

Cold Milling

Safely removes existing road surfaces, offering minimal disruption to surrounding infrastructure.

Surface Trimming & Leveling

Using road profilers, we ensure that surfaces are perfectly leveled and ready for new asphalt or other materials.

Custom Milling Solutions

Tailored services to meet the unique needs of residential, commercial, and industrial projects.

Why Choose Us?

Precision Cuts

Our road profilers offer an accurate, clean cut, maintaining the integrity of the subgrade and surrounding areas.

Time-Saving Process

By combining several processes into one, we minimize downtime and reduce overall project costs.

Eco-Friendly Approach

The material removed during milling is often reused or recycled, contributing to environmentally sustainable practices.

Reliable & Experienced Team

Our skilled operators use the latest technology to ensure safe and effective profiling, on every project.

Contact Us for Superior Asphalt Solutions in Brisbane, Sunshine Coast & Gold Coast

CASE STUDIES

Featured Project

Lakeside International
Racetrack

BRISBANE,QLD

The recent resurfacing project involved the profiling, priming, and asphalting of 5,971m².

Over the course of four days, Swarly Road Construction successfully completed all phases of the work. On Day 1, we supplied and operated a 2-meter profiler to mill the surface to a nominal 60mm depth, including the cartage and on-site disposal of the material.

Day 2 saw the application of AMC00 prime at a rate of 0.8 L/m² to ensure proper bonding. Days 3 and 4 involved the supply, laying, and compaction of 896 tonnes of AC14 asphalt A15E binder across two days, at a consistent 60mm depth.

The project also included a full paving crew, secondary paver, operators, cartage, and tack, where required. The project was completed efficiently and to the highest standards, ensuring a durable, long-lasting surface.